Can both HV and LV motor FAT be witnessed?
Yes, the actual test scope depends on the motor, supplier procedure and project requirements.
A practical checklist for preparing and witnessing industrial motor Factory Acceptance Tests at a manufacturer.
Motor FAT preparation covering motor identity, test sequence, electrical measurements, running observations, vibration, bearings, cooling and reporting references.
Use the points below to prepare the assignment and reduce avoidable clarification before the supplier visit.
Current and clearly identified project documents make the inspection request easier to review and execute.
A useful inspection workflow keeps observations traceable and gives the project team a clear next action.
Yes, the actual test scope depends on the motor, supplier procedure and project requirements.
Equipment identity, test setup, relevant instrumentation and the agreed test sequence should be clear before witnessing begins.
Yes, bearing condition, insulation-related checks or other specified observations can be included when part of the procedure.
Send the manufacturer location, equipment, inspection stage and required date. We will review the assignment details and respond through the project contact channel.
Send the manufacturer location, equipment and requested inspection date.